Power Grid Conditions

EIA hourly demand monitoring for PJM, California ISO and ERCOT. Demand is an operating measurement, not proof of grid stress or an outage. Demand deviations can provide operating context, but supply reserves and explicit operator alerts are needed to establish stress.

Current reading

California Independent System Operator

CISO · 23,032 MWh hourly demand

Source record ·

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

Electric Reliability Council of Texas, Inc.

ERCO · 51,312 MWh hourly demand

Source record ·

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

PJM Interconnection, LLC

PJM · 94,245 MWh hourly demand

Source record ·

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

Three named US balancing authorities only; no national grid verdict.

Collector availability
Live
Collection freshness
Last successful collection .

Historical comparison

California Independent System Operator

CISO · 23,032 MWh hourly demand

Source record ·

MWh · source observation times

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

Electric Reliability Council of Texas, Inc.

ERCO · 51,312 MWh hourly demand

Source record ·

MWh · source observation times

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

PJM Interconnection, LLC

PJM · 94,245 MWh hourly demand

Source record ·

MWh · source observation times

Day-ahead forecast: unavailable. Reference, not historical normal. Demand does not establish reserve shortage or an outage.

Official source ↗

Interpretation

These are source measurements, official forecast records or issued bulletins—not a statistical anomaly verdict. Forecasts are not observed events. No aggregate risk or historical normal range is inferred.

What movement could mean
  • Measured operating demand
  • Difference from published day-ahead forecast

Descriptive source records, not a validated wider-crisis forecast. Does not change your personal Canary Condition. Source-reported severity, statistical deviation and real-world risk are different questions. This reading does not independently support a hypothesis about intent or cause.

Evidence and limitations

Cadence and latency
Collection is scheduled every 60 minutes. Collection cadence is not source latency; no measured end-to-end latency is provided here. Source publication and revisions can delay what is visible.
Known false-positive patterns
  • Normal weather-driven demand
  • Scheduled forecast revisions
  • Calling high demand an emergency
Coverage and blind spots
  • Collection requires a free project EIA key; demonstration access is not used for recurring collection.
  • Hourly reports can lag or be revised.
  • Forecast difference is not a reserve shortage or predicted outage.
  • No operator-emergency status or historical normal range is claimed.
Technical detail
Measurement definition
Completed UTC-hour actual demand in MWh, with same-authority and same-hour day-ahead forecast as a reference, never a normal baseline.
Raw metric
Not configured
Method
Key-backed hourly reads of D and DF rows over 72 hours. Only completed-hour actual demand is stored as measured activity; forecast reference stays metadata. No invented reserve thresholds or anomaly score.
Stored observations
1,791

Observations in range

Recent collection runs

  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored
  • · success · 216 stored

How this works

Actual demand and day-ahead forecasts remain separate. Each authority and source hour is kept individually.

Key-backed collection is connected. Demand and forecast references do not establish power-grid stress.